Version 2 - Current Planning Scheme
- Citation and commencement
- Part 1 About the planning scheme
- Part 2 State planning provisions
- Part 3 Strategic framework
- Part 4 Local Government Infrastructure Plan (LGIP)
- Part 5 Tables of assessment
- Part 6 Zones
- Part 7 Local plans
- Part 8 Overlays
- Part 9 Development codes
- Part 10 Other plans
- Schedule 1 Definitions
- Schedule 2 Mapping
- Schedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
- Schedule 4 Notations required under the Planning Act 2016
- Schedule 5 Land designated for community infrastructure
- Schedule 6 Planning scheme policies
- Appendices
9.3.7 Reconfiguring a lot
9.3.7.1 Application
This code applies to assessing reconfiguring a lot development other than reconfiguring one lot into two to which the state wide code – Reconfiguring a lot (subdividing one into two lots) and associated operational work code applies. When using this code, reference should be made to section 5.3.2 and where applicable, section 5.3.3 located in Part 5.
9.3.7.2 Purpose
The purpose of the reconfiguring a lot code is to:
Note—In order to demonstrate compliance with this code, Council may request the preparation of a Plan of development for the locality, which may include land external to the site. This is likely where the proposed development involves more than 5 lots or the construction of a new road. The Plan of development should be prepared in accordance with the provisions of this code in conjunction with SC6.3 Plans of development particularly in regard to the development of New Neighbourhoods in the Emerging community zone. Plan of development may form the basis of a preliminary approval for development in an area.
- The purpose of the reconfiguring a lot code is to:
- Ensure that new lots are configured in a manner that facilitates the achievement of the sustainable urban and rural outcomes expressed in the relevant zone codes.
- Ensure that new lots are provided with infrastructure and access appropriate for their intended use.
- Minimise adverse environmental impacts and protect the landscape character of Gladstone's natural resources.
- The purpose of the code will be achieved through the following overall outcomes:
- New lots are of a size and shape appropriate for their intended use and the character of the applicable zone.
- New lot reconfiguration is responsive to topography, natural drainage systems, vegetation and habitat corridors and protects the landscape character of the locality.
- Lots ensure the amenity of and minimise impacts on adjoining land.
- Each new lot is provided with a suitable level of infrastructure, services and access.
- New neighbourhood development is characterised by walkability, housing choice and conveniently located centres providing enhanced opportunities for social interaction.
- Neighbourhoods are designed to allow development to incorporate climate responsive, energy efficient design principles.
- Streets are legible, safe, highly interconnected and designed to achieve enhanced streetscapes.
- Rural areas are not fragmented to the detriment of productive grazing, agricultural or other rural uses.
- Open space meets the active and passive recreational needs of the community and protects the biodiversity of natural areas and systems.
9.3.7.3 Assessment benchmarks
Table 9.3.7.3.1—Assessable development
Performance outcomes | Acceptable outcomes |
---|---|
Lot design |
|
PO1 Reconfiguration creates lots that are of a sufficient size, shape and dimension:
|
AO1 Lots comply with the minimum lot size and dimensions specified for its zone in Table 9.3.7.3.2—Minimum lot size and dimensions. |
PO2 Rear lots are only created where:
|
AO2.1 Only 1 rear lot is provided behind each full frontage lot. |
AO2.2 The number of adjoining rear lots does not exceed 2 and not more than 4 lots directly adjoin a rear lot (excluding lots that adjoin at one point). |
|
AO2.3 The minimum size of a rear lot, excluding its access handle is:
|
|
AO2.4 The access handle of the rear allotment has a minimum width of 4m. |
|
PO3 Any boundary realignment must:
|
AO3.1 No additional lots are created. |
AO3.2 The realignment meets the minimum lot size and dimensions in accordance with Table 9.3.7.3.2—Minimum lot size and dimensions. |
|
PO4 Any boundary realignment that is resolving a building encroachment must:
|
No acceptable outcome is nominated. |
General design |
|
PO5 The layout of lots, streets and infrastructure avoids or minimises impacts on environmental features by:
|
No acceptable outcome is nominated. |
PO6 Reconfiguration is designed to ensure integration with the surrounding locality, having regard to:
|
No acceptable outcome is nominated. |
Neighbourhood design in residential zones (Note: This also applies to Plans of development in the Emerging community zone) |
|
PO7 Reconfigurations are designed to ensure:
|
No acceptable outcome is nominated. |
PO8 A variety of lot sizes are provided in close proximity to neighbourhood centres and parks to promote a wider housing choice and mix that is consistent with zone outcomes. |
No acceptable outcome is nominated. |
PO9 Neighbourhood design provides for safer communities by maximising opportunities for casual surveillance and minimising opportunities for crime and vandalism. Note—Applicants may find useful guidance in the Queensland Government's Crime Prevention through Environmental Design Guidelines for Queensland. |
No acceptable outcome is nominated. |
PO10 Movement and open space networks are:
|
AO10.1 Street blocks have a maximum length of 200m and depth of 80m. |
AO10.2 Where street blocks have a length in excess of 150m a mid–block pedestrian link not less than 5m wide is provided to encourage walkability. |
|
AO10.3 Collector roads linking neighbourhoods are provided on a grid of not less than 800m. |
|
PO11 Movement networks prioritise walking, cycling and public transport within neighbourhoods. |
AO11 Ninety percent of all dwellings are within 400m walking distance of an existing or planned public transport stop, park and or community facility. |
PO12 The permeability and connectivity of streets is not compromised by the use of cul–de–sacs unless no alternative arrangement is possible. |
No acceptable outcome is nominated. |
Climate responsive design |
|
PO13 Neighbourhood layouts are designed to respond to local climate conditions and enable energy efficient dwellings. |
AO13 Streets are generally configured to run in a north–south direction between 30o east and 20o west of true north or an east–west direction between 20o north and 30o south of east. |
PO14 Smaller or wider lots are located as north facing lots and larger or narrower lots are located as south facing lots. |
No acceptable outcome is nominated. |
Lot reconfiguration in industrial zones |
|
PO15 Reconfiguration includes a range of lot sizes to facilitate industrial activities applicable to the zone. |
No acceptable outcome is nominated. |
PO16 Reconfiguration maximises access to any railway, transport route, intermodal terminal or sea port. |
No acceptable outcome is nominated. |
PO17 Where reconfiguration adjoins land in another zone, lots are of a sufficient size to mitigate any noise, air quality and visual impacts on that adjoining land. |
No acceptable outcome is nominated. |
Lot reconfiguration in the Rural zone |
|
PO18 Reconfiguration:
|
No acceptable outcome is nominated. |
PO19 Reconfiguration of land identified as Agricultural land Class A and B does not:
Note—Class A and B agricultural land is identified in the Agricultural land classification overlay map. |
AO19 Fragmentation of land designated as Agricultural land Class A or B does not occur in the Rural zone. |
Infrastructure and services Note—Refer also to the Development design code. |
|
PO20 Each reconfigured lot is provided with infrastructure and services appropriate to its intended use and location in a manner that:
|
AO20.1 Lots created within a designated Priority Infrastructure Plan area for a reticulated water supply and/or a reticulated sewerage supply, are connected to that supply in accordance with the Engineering Design Planning Scheme Policy. |
AO20.2 Lots created include stormwater infrastructure in accordance with the design requirements of the Engineering Design Planning Scheme Policy. |
|
AO20.3 Lots are connected to electricity and telecommunications infrastructure in accordance with the standards of the relevant regulatory authority prior to the commencement of any use of the site. |
|
AO20.4 Electricity and telecommunications infrastructure is provided underground where the reconfiguration occurs in an urban area and exceeds 5 new lots. |
|
PO21 Where reconfiguration proposes individual on–site waste water disposal, it must be demonstrated that:
|
No acceptable outcome is nominated. |
Access and road design Note—Refer also to the Development Design Code. |
|
PO22 Lots have safe access for vehicles and pedestrians through:
|
AO22 Lots are designed to achieve safe vehicle and pedestrian access in accordance with the Engineering Design Planning Scheme Policy. |
PO23 Reconfiguration involving the creation of new roads must:
|
No acceptable outcome is nominated. |
PO24 New roads include streetscape and landscape treatments that:
|
No acceptable outcome is nominated. |
PO25 Rear lanes:
Note— Applicants should have regard to Crime Prevention through Environmental Design Guidelines for Queensland. |
AO25 Rear lanes are designed in accordance with the Engineering design planning scheme policy.
Note—In accordance with Councils road hierarchy, rear lanes are to be constructed as access lanes. |
Pedestrian and cycle infrastructure Note—Refer also to the Development Design Code. |
|
PO26 Reconfiguration includes appropriate pedestrian and cycle infrastructure that:
|
No acceptable outcome is nominated. |
Stormwater management Note—Refer also to the Development Design Code. |
|
PO27 Reconfiguring a lot development:
|
No acceptable outcome is nominated. |
Parks and open space Note—Where acceptable outcomes are set out in this section, it is acknowledged that they may only be practicable in greenfield developments. Alternative outcomes are likely to be appropriate in existing developed areas. This may include works and embellishment to existing parks or recreational corridors to meet the development's demand, or as part of an infrastructure agreement. |
|
PO28 Reconfiguring a lot provides parkland or open space which:
|
AO28 Parkland is provided in accordance with the Local Government Infrastructure Plan. |
PO29 The design of parkland or open space:
|
No acceptable outcome is nominated. |
PO30 The location of parkland or open space is conveniently located to residential neighbourhoods. |
AO30 Parkland is provided within 400m of all residential dwellings. |
PO31 Open space for conservation purposes protects riparian corridors, beach front vegetation, endangered plant communities and wildlife habitat and movement corridors. |
No acceptable outcome is nominated. |
Volumetric reconfiguration |
|
PO32 Volumetric reconfiguration (subdivision of space above or below the surface of land):
|
No acceptable outcome is nominated. |
Access easement |
|
PO33 The access easement must:
|
AO33 The access easement is designed in accordance with the design requirements of the Engineering Design Planning Scheme Policy. |
Community title subdivisions |
|
PO34 Community title subdivisions are only supported in instances where:
Note—Community title subdivisions are not supported in any other instance. |
AO34 No acceptable outcome is nominated. |
Table 9.3.7.3.2—Minimum lot size and dimensions
Column 1 Zone |
Column 2 Minimum lot size |
Column 3 Minimum frontage |
---|---|---|
Low density residential |
600m2; or 800m2 if in the Calliope neighbourhood precinct |
17m |
Low–medium density residential Medium density residential |
400m2; or 1,000m2 where in the Beaches village circuit precinct |
10m; or 30m where in the Beaches village circuit precinct |
Character residential | Not specified | Not specified |
Mixed use |
600m2 | 15m |
Neighbourhood centre | 400m2 | 15m |
Specialised centre | 1,000m2 | 15m |
Township | 800m2 where unsewered, subject to capability of the site to sustainably dispose of effluent on site | 20m |
Sport and recreation | Not specified | Not specified |
Open space | Not specified | Not specified |
Conservation | Not specified | Not specified |
Low impact industry | 1,000m2 | 20m |
Medium impact industry | 4,000m2 | 40m |
Special industry | Not specified | Not specified |
Industry investigation | 50ha | Not specified |
Community facilities | Not specified | Not specified |
Environmental management | Not specified | Not specified |
Limited development (constrained land) | 50ha where in the Flood affected lands precinct | Not specified |
250ha where in the Major industry buffer precinct | ||
Rural zone | 250ha | 300m |
Rural residential | 6,000m2 (where lots are provided with full service reticulated water supply) | 40m |
1.5ha (in all other circumstances including the Beecher/Burua constant flow precinct) | ||
Emerging community | 50ha | Not specified |
Major tourism | 2ha | 40m |
Minor tourism | 600m2 | 15m |
Special purpose | Not specified | Not specified |